Suraj lists 13.46 lakh sq ft pipeline led by Mahim, commercial
Suraj Estate Developers Ltd. lists 13.46 lakh sq ft of estimated sale carpet area across 18 pipeline entries, with Mahim contributing 8.73 lakh sq ft and commercial schemes 4.35 lakh sq ft. The table includes 2.76 lakh sq ft for three Bandra luxury residential projects, while Suraj says plan approvals can change actual area.
What is Suraj’s planned sale-area pipeline?
Suraj’s listed pipeline totals 13.46 lakh sq ft of estimated carpet area for sale across residential and commercial projects. Mahim (W) accounts for 8.73 lakh sq ft and the three Bandra (W) projects account for 2.76 lakh sq ft, taking the two locations together to 11.49 lakh sq ft of the stated total.
The 18 numbered positions include one grouped entry for Bandra Projects 1, 2 and 3. The largest individual line item is the commercial Marinagar Phase 2 and 3 project in Mahim at 2.85 lakh sq ft, followed by the grouped Bandra projects at 2.76 lakh sq ft and Girgaonkarwadi in Mahim at 2.00 lakh sq ft.
The pipeline is separate from Suraj’s ongoing portfolio, which has 7.57 lakh sq ft of sale carpet area, including 6.36 lakh sq ft sold and 1.20 lakh sq ft unsold. Suraj says its pipeline estimates rely on assumptions and may vary after the Brihanmumbai Municipal Corporation, or BMC, approves plans.
Which locations and segments drive Suraj’s future projects?
Mahim drives Suraj’s listed future area with 8.73 lakh sq ft, split between 4.35 lakh sq ft of commercial space and 4.38 lakh sq ft of residential space. Its commercial entries are Suraj One Business Bay Phase 2 at 1.50 lakh sq ft and Marinagar Phase 2 and 3 at 2.85 lakh sq ft.
Bandra is the next-largest location at 2.76 lakh sq ft, entirely classified as luxury residential across its three grouped projects. Dadar (W) and Dadar (West) together provide 1.08 lakh sq ft through six residential entries, ranging from 0.07 lakh sq ft at Norman House to 0.33 lakh sq ft at Gudekar House, Irani Building and Ratnabhoomi Building.
Residential projects make up 9.11 lakh sq ft of the pipeline, compared with 4.35 lakh sq ft for commercial projects. Outside Mahim, Bandra and Dadar, the remaining 0.89 lakh sq ft is divided among JRU Property in Byculla at 0.21 lakh sq ft, Ambavat Bhawan and RK Mansion in Lower Parel at 0.32 lakh sq ft, and Prabhadevi at 0.36 lakh sq ft.
How does commercial development feature in Suraj’s expansion?
Commercial development represents 4.35 lakh sq ft of Suraj’s planned sale area, concentrated entirely in Mahim. Marinagar Phase 2 and 3 contributes 2.85 lakh sq ft, which is 1.35 lakh sq ft more than the 1.50 lakh sq ft assigned to Suraj One Business Bay Phase 2.
The proposed Phase 2 project sits alongside the ongoing Suraj One Business Bay development, which has 2.09 lakh sq ft of sale carpet area. The ongoing project has sold 1.01 lakh sq ft, retains 1.08 lakh sq ft as unsold area, and reports Rs 452.48 crore of balance receivables.
Suraj has entered a memorandum of understanding to acquire development rights for an adjoining parcel at Suraj One Business Bay. The company says that, if this proceeds, total land area is expected to reach about 5,941 square metres, saleable area about 3.59 lakh sq ft, and combined gross development value, or GDV, about Rs 2,000 crore, from about Rs 1,200 crore.
What could change Suraj’s pipeline area and land position?
Suraj identifies floor space index, or FSI, mechanisms that could increase area on specified projects. For the three Bandra projects, it is considering development under Regulations 33(9), 33(10), 33(11), 33(12) and 33(17) of the Development Control and Promotion Regulations 2034, with estimated sale carpet area rising to 2.76 lakh sq ft from 1.69 lakh sq ft.
At Lobo Villa and Ellis Villa in Mahim, Suraj plans to use FSI benefits under Regulations 33(7) and 33(12), which it says could raise saleable carpet area to 0.47 lakh sq ft from 0.30 lakh sq ft. Marinagar Phase 2 and 3 is eligible for additional FSI under the Transit Oriented Development Metro FSI Scheme under Regulation 33(23), although the presentation does not quantify any resulting increase.
Suraj reports 10,359.77 square metres of land reserves, comprising 9,631.35 square metres in Bandra (W) and 728.42 square metres in Santacruz (E). The six Bandra parcels are associated with Accord Estates Pvt. Ltd., where the effective stake is listed as 100%, and the largest individual parcel is C.T.S. No. 917 at 3,884.91 square metres.
When will Suraj’s pipeline projects be delivered?
Suraj does not disclose completion dates or a launch timetable for the 13.46 lakh sq ft pipeline table. This differs from its ongoing-project disclosure, where filed completion dates run from 31 January 2027 for Palette to 31 December 2031 for Suraj Aureva, Suraj Parkview 1 and Suraj One Business Bay.
The company expects Rs 1,876 crore of sold and unsold receivables from ongoing projects to flow during FY26 to FY31E. That comprises Rs 1,168 crore of balance receivables from sold area and Rs 708 crore of estimated GDV from unsold area, rather than a forecast attached to the 18 pipeline positions.
Conclusion
Suraj’s pipeline is concentrated in Mahim and Bandra, which together account for 11.49 lakh sq ft of the 13.46 lakh sq ft estimate. Residential developments provide 9.11 lakh sq ft, while the 4.35 lakh sq ft commercial component is concentrated in Mahim through Marinagar Phase 2 and 3 and Suraj One Business Bay Phase 2.
The next disclosed milestones are BMC plan approvals, Suraj’s decisions on the cited FSI regulations and any quantified area increase from the Transit Oriented Development Metro FSI Scheme at Marinagar. The company has set FY26 to FY31E as the expected period for Rs 1,876 crore of ongoing-project receivables, but has not provided a corresponding delivery schedule for the pipeline.
Frequently Asked Questions
Did your stocks survive the war?
See what broke. See what stood.
Live Q2 Earnings Tracker