Highway Infrastructure Limited Secures Rs 431.86 Crore NHAI Contracts
Key highlights
- Highway Infrastructure won two one-year NHAI toll collection contracts worth Rs 431.86 crore combined.
- The Palayam Fee Plaza contract in Tamil Nadu is worth Rs 340.08 crore and is the company’s largest order to date.
- The Baiti Kala Fee Plaza contract in Uttar Pradesh is worth Rs 91.78 crore, with its Letter of Acceptance issued on October 26, 2026.
- Highway Infrastructure shares rose from about Rs 43 on September 29 to Rs 75.29 on October 28 after recent toll-order announcements.
powered by IRIS

Highway Infrastructure secured Rs 431.86 crore of National Highways Authority of India (NHAI) toll collection contracts, including Rs 340.08 crore for Palayam, for one-year operations in Tamil Nadu and Uttar Pradesh. The combined awards make Palayam the company’s largest contract to date and add two fee-plaza operating assignments to its highway services portfolio.
Know Highway Infrastructure inside out
Results, valuation, peers and who's buying, in one view.
What NHAI contracts has Highway Infrastructure won?
Highway Infrastructure has won two one-year contracts to operate fee plazas and collect user fees for NHAI, with a combined estimated value of Rs 431.86 crore. The larger contract is for the Palayam Fee Plaza in Tamil Nadu and is valued at Rs 340.08 crore. It is the highest-value order received by the company to date.
The second assignment is for the Baiti Kala Fee Plaza in Uttar Pradesh, valued at Rs 91.78 crore. The two awards were made through competitive electronic tenders and cover toll operations rather than construction of new highway assets.
Palayam Fee Plaza is located at Km 154/500 on NH-44, on the Krishnagiri to Thumbipadi stretch between Km 94.000 and Km 180.000. Baiti Kala is located at design Km 175.050 on the four-lane Sultanpur-Varanasi corridor. NHAI issued the Letter of Acceptance for the Baiti Kala mandate on October 26, 2026.
What work will Highway Infrastructure perform at Palayam and Baiti Kala?
Highway Infrastructure will operate the designated plazas, collect applicable user fees and maintain toilet blocks adjacent to the facilities. The scope includes replenishing consumables at the toilet blocks, making the assignments broader than fee collection alone.
The Baiti Kala contract carries a stated consideration of Rs 91.78 crore and covers the Sultanpur-Varanasi route, previously identified as NH-56 and now designated NH-731. The company’s disclosure did not specify the exact date on which toll collection will begin at the plaza.
Both contracts have a one-year execution period. The awards therefore provide a defined period of operating revenue visibility, subject to the operational terms of the NHAI mandates, rather than a multi-year construction schedule.
How were the NHAI contracts awarded and why do they matter?
NHAI selected Highway Infrastructure through a competitive electronic tender process, which is the procurement method disclosed for both assignments. The contracts expand the company’s role in user-fee collection at national highway plazas, an activity it has undertaken as part of its infrastructure services business.
The size of the Palayam mandate is significant because it is the company’s largest order so far. At Rs 340.08 crore, it accounts for nearly four-fifths of the Rs 431.86 crore combined value of the two NHAI awards. Baiti Kala adds a separate operating assignment in Uttar Pradesh, giving the company contracts across two states.
The company is headquartered in Indore and was incorporated in 2006. Its disclosed business activities include infrastructure services and the operation and collection of user fees at national highway fee plazas for NHAI. These awards are operational contracts, so performance will depend on managing fee collection and associated facility maintenance during the stated period.
Got a follow-up? Ask IRIS
How do the new contracts fit Highway Infrastructure’s recent order flow?
The NHAI awards follow a series of toll-related assignments reported by Highway Infrastructure during 2026. The company received a Rs 24.46 crore Velanchettiyur Fee Plaza contract in Tamil Nadu for 90 days, signed on October 8, and a Rs 220.66 crore, two-year Gorakhpur Link Expressway mandate in September from the UP Expressways Industrial Development Authority.
The Palayam Letter of Acceptance was reported on October 23, 2026, followed by the Baiti Kala Letter of Acceptance on October 26. These assignments show a concentration of recent work in toll collection and highway operations, including orders from NHAI and a state expressways authority.
The stock also drew buying interest after the toll order announcements, according to the source material. Shares rose from about Rs 43 on September 29 to Rs 75.29 on October 28, before profit booking was reported after a four-day rally. The reported movement reflects market attention on order announcements, while the disclosures do not quantify the eventual financial contribution from each contract.
At its October 14 board meeting, the company also approved a preferential issue of up to one crore fully convertible warrants to promoter and promoter-group members for up to Rs 49 crore. The board additionally approved an increase in authorised share capital and the acquisition of a controlling stake in Indore Highway Real Estates Private Limited.
Conclusion
The Rs 431.86 crore NHAI awards strengthen Highway Infrastructure’s order flow in toll-plaza operations, led by the Rs 340.08 crore Palayam mandate in Tamil Nadu. Together with the Rs 91.78 crore Baiti Kala assignment in Uttar Pradesh, the contracts widen the company’s operational presence while retaining a one-year execution framework for each project.
Investors will watch for the commencement of toll collection, particularly at Baiti Kala, as the company has not disclosed an exact start date. The execution of the one-year mandates, progress on the approved promoter warrant issue and any further toll-operation orders will be relevant disclosed developments to monitor.


