Actions
Get instant AI-powered insights about company performance, financials, and strategy. Ask questions about trends, competition, and developments while receiving responses backed by official documents and market data, with clear attribution to source documents.


Bearish
4
Neutral
6
Bullish
4
Bearish
33
Neutral
6
Bullish
7
Bearish
29
Neutral
0
Bullish
3
Bearish
29
Neutral
0
Bullish
3
Bearish
29
Neutral
0
Bullish
3
Bearish
29
Neutral
0
Bullish
3
Construction
Civil Construction
7 Cr
Low Risk
-0.1
21.6
—
—
15.39
4.29
Sales CAGR
Profit CAGR
ROE
ROCE
Investor Presentation
Q4 FY26
P B A Infrastructure Ltd (PBAINFRA) is currently trading at 5.50 per share. Stock prices fluctuate during market hours on NSE and BSE based on demand, company updates, and overall market conditions. Refer to the live price chart above for the most recent price movement.
PBA Infrastructure Limited is an India-focused civil engineering and EPC company founded in 1974, specialising in highways, dams, bridges, runways and heavy RCC structures; it has executed BOT projects and earlier completed a joint venture with Sadbhav Engineering for the Aurangabad-Jalna project, and remains project‑centric rather than consumer‑brand driven. The company’s audited FY2026 results show a marked deterioration: total income declined materially year‑on‑year to Rs.24.84 crore (2,484.35 lakh) and the standalone net loss for the year stood at approximately Rs.57.12 crore (5,711.61 lakh), resulting in negative net worth and stressed profitability according to the statutory financials. Auditor disclosures and notes record severe financial distress: classification as NPA since 2013, consortium overdue exposures initially noted at Rs.315.15 crore with consortium-confirmed book liabilities of Rs.214.59 crore, SARFAESI / e‑auction notices, DRT stay on physical possession, and the company not recognising interest since January 2018 because of bank classification. Working capital and asset quality are under strain: total assets reduced to Rs.243.89 crore (24,389.13 lakh) versus total liabilities of Rs.440.67 crore (44,067.12 lakh), significant unbilled work‑in‑progress and claims of Rs.24.63 crore are recorded but expressly disclosed as uncertain and subject to arbitration or negotiation. Governance and compliance actions in the quarter include audited financials with an auditor’s qualified discussion on going‑concern risk, re‑appointment of secretarial and internal auditors, and management continuing to present results on a going‑concern basis despite material uncertainties disclosed by the statutory auditor.
Over the past 52 weeks, P B A Infrastructure Ltd has traded between a low of ₹4.29 and a high of ₹15.39. The 52-week high and low indicate the stock’s price range over the last year and help investors understand its volatility and recent trading levels.
P B A Infrastructure Ltd has a market capitalization of approximately 7.43. Market capitalization represents the total value of a company’s outstanding shares and helps investors understand its size, stability, and relative risk compared to other listed companies.
P B A Infrastructure Ltd’s investment profile depends on its business fundamentals, valuation, and long-term outlook. The stock currently trades at a PE ratio of -0.09 and operates in the its sector sector. Investors typically assess financial performance, growth prospects, and individual risk tolerance before making investment decisions.
Based on its market capitalization of 7.43 Cr, P B A Infrastructure Ltd is classified as a Small Cap stock. Large-cap stocks are generally more stable, while mid-cap and small-cap stocks tend to offer higher growth potential along with higher price volatility.
P B A Infrastructure Ltd operates in the its sector sector. Sector classification matters because companies in the same sector are often affected by similar economic conditions, regulatory changes, and competitive dynamics, which can influence overall stock performance.
The Price-to-Earnings (PE) ratio of P B A Infrastructure Ltd is -0.09. The PE ratio compares a company’s share price to its earnings and is commonly used to assess valuation. Comparing the PE ratio with sector peers and historical levels provides better context.
NCLT Mumbai has admitted Canara Bank’s Section 7 petition and initiated CIRP against PBA Infrastructure, as disclosed in the company’s September 30, 2026 exchange filing.
An announcement dated 30 September 2026 states that PBA Infrastructure Limited has had its corporate insolvency resolution process (CIRP) admitted.
For the quarter ended March 2026 (Q4 FY26), PBA Infrastructure reported a net loss of ₹57.12 crore.
