Suraksha plans 11 more centres after nine FY27 launches
Key highlights
- Suraksha has launched 3 hubs and 6 spokes in FY27 to date.
- Suraksha lists 4 hubs and 7 spokes as upcoming in its FY27 pipeline.
- Greater Kolkata generated 67% of Suraksha’s H1 FY27 revenue, while Rest of Bengal generated 29%.
- Suraksha spent Rs 33.59 crore on property, plant and equipment and intangible assets in H1 FY27.
powered by IRIS

Suraksha Diagnostic Limited has launched nine centres in FY27 to date, comprising three hubs and six spokes, and lists 11 further sites comprising four hubs and seven spokes as upcoming. The rollout includes its first Jharkhand centre at Dhanbad and a six-centre pipeline in Rest of Bengal.
Know Suraksha Diagnostic inside out
Results, valuation, peers and who's buying, in one view.
How many centres has Suraksha launched and planned in FY27?
Suraksha has launched three hubs and six spokes in FY27 to date, while its listed upcoming pipeline contains four hubs and seven spokes. The nine launched centres and 11 upcoming centres make the disclosed FY27 rollout programme 20 centres, split between hubs and satellite spokes.
Suraksha’s upcoming mix contains four hubs among 11 sites, compared with three hubs among the nine sites launched to date. The presentation does not provide opening dates for the 11 upcoming centres, but it identifies the geographic allocation of each hub and spoke in the pipeline.
Which centres has Suraksha opened in H1 FY27?
Suraksha’s H1 FY27 disclosures name new facilities at Mukundapur, Malegaon, Arambagh, Berhampur, Dhanbad, Karimpur and Nabadwip, as well as a new Asian Institute of Immunology and Rheumatology centre. The presentation also identifies a hub centre at Uttarpara, although that slide does not specify a separate opening period.
The two expressly commissioned spoke centres at Malegaon and Arambagh were intended to add catchment density around established hubs. Dhanbad, by comparison, marked Suraksha’s entry into Jharkhand as its first centre in that state, while Karimpur extended pathology and radiology services across Nadia district in West Bengal.
Suraksha also inaugurated its new Asian Institute of Immunology and Rheumatology, or AIIR, centre in H1 FY27 with a day-care facility. The presentation does not assign the AIIR centre a hub or spoke classification in the FY27 centre table, which reports the formal total of three hubs and six spokes.
What capabilities do Suraksha’s new hub centres provide?
Suraksha’s Mukundapur hub has a 3 Tesla magnetic resonance imaging, or 3T MRI, system and a computed tomography, or CT, suite. The centre was launched in H1 FY27 to provide advanced imaging capability to the Mukundapur catchment.
Suraksha’s Berhampur hub combines an in-house laboratory with a 3T MRI, bringing pathology and imaging capacity together at one site. Its Dhanbad hub also has MRI capability and offers integrated pathology and radiology, a configuration introduced with Suraksha’s H1 FY27 entry into Jharkhand.
The disclosed spoke format serves a different role in the network. Malegaon and Arambagh were described as improving local density around existing hubs, while Nabadwip was commissioned as a new spoke in H1 FY27; this contrasts with the specified imaging and laboratory infrastructure at Mukundapur, Berhampur and Dhanbad.
Got a follow-up? Ask IRIS
Where is Suraksha expanding beyond its main revenue markets?
Suraksha’s 11-centre upcoming pipeline spans Greater Kolkata, Rest of Bengal, Jharkhand, Tripura, Assam and Bihar. Rest of Bengal has the largest planned allocation at one hub and five spokes, while Tripura and Bihar each have one upcoming hub and Jharkhand has one further hub after the Dhanbad opening.
Suraksha reported that Greater Kolkata generated 67% of H1 FY27 revenue, compared with 29% from Rest of Bengal, 3% from Assam and 1% from Bihar. Greater Kolkata’s share was 38 percentage points above Rest of Bengal’s, while the two West Bengal segments together accounted for 96% of reported H1 FY27 revenue.
The pipeline adds capacity in markets with differing current revenue contributions. Assam, which contributed 3% of H1 FY27 revenue, has one upcoming spoke after one FY27 spoke launch, whereas Bihar, which contributed 1%, has one upcoming hub despite no FY27 launch shown in the expansion table.
What financial figures provide context for Suraksha’s expansion?
Suraksha spent Rs 33.59 crore on property, plant and equipment and other intangible assets in H1 FY27, up from Rs 23.46 crore in H1 FY26. Net cash from operating activities rose to Rs 58.79 crore from Rs 36.69 crore, while cash flow from investing activities was an outflow of Rs 47.57 crore versus an outflow of Rs 21.81 crore a year earlier.
The increase in property, plant and equipment and intangible-asset purchases was Rs 10.13 crore year on year, alongside a Rs 22.10 crore increase in net operating cash flow. These consolidated cash-flow figures do not allocate spending to individual centres, so they provide context for the rollout rather than a disclosed cost per hub or spoke.
Suraksha’s centre-age data show a margin difference between established and newer locations in Q2 FY27. Centres older than two years recorded a 42.0% earnings before interest, tax, depreciation and amortisation, or EBITDA, margin, compared with 11.8% for centres under two years; the younger group improved from 6.5% in Q1 FY27 and the older group from 40.9%.
Conclusion
Suraksha’s FY27 network programme combines nine launched centres with 11 identified upcoming sites, using hubs with specified MRI, CT or laboratory capability alongside spokes intended to build catchment density. The programme also establishes a presence in Jharkhand through Dhanbad, while Rest of Bengal has the largest upcoming allocation at six centres.
The next point to watch is execution of the four planned hubs and seven planned spokes, particularly the further Jharkhand hub and the first listed hubs in Tripura and Bihar. Management has not disclosed opening dates or centre-level investment budgets for the 11 upcoming sites, leaving later disclosures to establish the timing and scale of the expansion.