Felix starts commercial metal recovery at its 4-TPD Mehsana plant
Max Plan at ₹4,999/yr₹8,999
Find your next multibaggerBe a Pro Investor
Research stocks and track your picks on the go. Download the app.
Key highlights
- Felix holds 79.34% of Tierra, which became a direct subsidiary in October 2026.
- Tierra’s Mehsana facility has 4 TPD of metal-recovery capacity and has commenced commercial production.
- Industrial Hazardous Metals Sludge Recycling Management reported Rs 39.40 lakh of H1 FY27 revenue, versus nil in H1 FY26.
- Felix’s April 2027E roadmap keeps metal-recovery capacity unchanged at 4 TPD.
powered by IRIS

Felix Industries Ltd has started commercial metal recovery through Tierra Fertilizer Private Limited’s 4-tonnes-per-day (TPD) facility in Mehsana, Gujarat, according to its November 2026 presentation. Felix reported Rs 39.40 lakh of H1 FY27 revenue from Industrial Hazardous Metals Sludge Recycling Management, compared with nil in H1 FY26, after acquiring a 79.34% holding in Tierra.
Know Felix Industries inside out
Results, valuation, peers and who's buying, in one view.
What did Felix acquire for metal recovery?
Felix acquired a 79.34% holding in Tierra, gaining a fully built 4-TPD facility in Mehsana that recovers metals from hazardous and non-hazardous industrial waste. Tierra was incorporated in September 2020, acquired through Felix Prime Metals in FY27, and became a direct Felix subsidiary in October 2026.
The acquisition creates Felix’s Industrial Hazardous Metals Sludge Recycling Management vertical, separate from its water, solid-waste and waste-oil operations. Tierra’s stated process covers the recovery, refining and casting of metals from industrial waste streams, while Felix reports 17+ million litres per day (MLD) of installed water and wastewater treatment capacity.
Felix describes the Mehsana site as a brownfield entry because it was already built and operational at acquisition. The presentation does not disclose the purchase consideration, Tierra’s historical revenue, the source of feedstock, or a separate utilisation level for the 4-TPD facility.
Has Felix’s Mehsana metal-recovery plant started production?
Felix says commercial production has commenced at Tierra’s 4-TPD Mehsana facility, although its capacity roadmap separately labels metal recovery as “currently under commissioning.” The Tierra subsidiary profile describes the plant as fully built and operational, giving the more specific statement on the status of commercial production.
The roadmap shows 4 TPD of metal-recovery capacity currently and 4 TPD expected by April 2027E, where E denotes estimate. This differs from Felix’s water and wastewater roadmap, which targets recurring-revenue capacity of 9.1 MLD by April 2027 from 5.9 MLD currently, a stated increase of 55%.
Felix’s future outlook says it plans to stabilise operations at Mehsana and develop zinc, copper and magnesium recovery streams. That plan indicates that operating ramp-up remains a management priority, but the presentation gives no date for full stabilisation, no production-volume target and no capacity expansion target beyond April 2027E.
What products will Felix make at the Mehsana facility?
Felix says Tierra will produce zinc sulphate, copper sulphate, metal ingots, chlorides and allied metal by-products from recovered industrial-waste metals. The facility’s stated operating scope includes processing, refining and casting, rather than merely collecting hazardous or non-hazardous waste.
Zinc sulphate and copper sulphate are the named chemical outputs, while ingots and chlorides add other product categories. Felix’s industry overview says approximately 38% of Indian soils are zinc-deficient and identifies zinc as 35.9% of the micronutrient fertiliser market in 2025, which it presents as an end-market context for recovered zinc sulphate.
Felix has also stated an intention to build a portfolio across zinc, copper and magnesium recovery streams after stabilising Mehsana. Magnesium is a disclosed development objective, not a confirmed current product from the 4-TPD plant, and the presentation provides no product-wise sales, customer, offtake or pricing information.
Got a follow-up? Ask IRIS
How much revenue has metal recovery contributed to Felix?
Felix reported Rs 39.40 lakh of H1 FY27 revenue from Industrial Hazardous Metals Sludge Recycling Management, against zero revenue in H1 FY26. The metal-recovery segment represented 0.7% of consolidated H1 FY27 revenue, making it the smallest of the four reported business verticals.
Water and Wastewater Management represented 64.2% of H1 FY27 consolidated revenue, Waste Oil Management represented 29.5%, and Solid Waste Management represented 5.6%. By value, water and wastewater revenue rose to Rs 38.43 crore in H1 FY27 from Rs 30.12 crore in H1 FY26, while waste-oil revenue increased to Rs 17.69 crore from Rs 5.69 crore.
Felix’s consolidated H1 FY27 revenue was Rs 59.88 crore, up from Rs 38.00 crore in H1 FY26. Earnings before interest, tax, depreciation and amortisation, or EBITDA, rose to Rs 20.65 crore from Rs 13.29 crore, while profit after tax increased to Rs 12.84 crore from Rs 8.90 crore; the presentation does not attribute those group-level changes specifically to metal recovery.
The segment’s Rs 39.40 lakh revenue provides evidence of an initial commercial contribution, but it does not establish plant utilisation or profitability. Felix does not disclose Tierra’s standalone revenue, earnings, sales volume, recovered-metal yield or working-capital requirement for H1 FY27.
What is Felix’s next plan for the Mehsana business?
Felix’s stated next step is to stabilise the 4-TPD Mehsana operation and build recovery streams across zinc, copper and magnesium. Its April 2027E roadmap keeps metal-recovery capacity unchanged at 4 TPD, so the disclosed plan focuses on commercialisation and product development rather than a numerical expansion.
Felix identifies Industrial Hazardous Metals Sludge Recycling Management as its “next growth engine” within a platform spanning water, waste oil, metals and solid waste. The company reports 50 TPD of installed and owned solid-waste capacity and 40 TPD of installed and owned waste-oil capacity, compared with 4 TPD in metals.
The presentation cites an India metal-recycling market expected to increase from USD 11.40 billion in 2024 to USD 18.87 billion by 2033, at a 5.3% compound annual growth rate from 2025 to 2033. These are industry estimates presented by Felix, not forecasts of Tierra’s future revenue, throughput or margins.
Conclusion
Felix has entered metal recovery through a ready-built 4-TPD Mehsana facility that has started commercial production and generated Rs 39.40 lakh of H1 FY27 segment revenue. The acquisition gives Felix a 79.34% holding in Tierra and adds zinc sulphate, copper sulphate, ingots and chlorides to a platform otherwise led by water and wastewater, which contributed 64.2% of H1 FY27 revenue.
The next disclosed milestones are the stabilisation of Mehsana operations and development of zinc, copper and magnesium recovery streams. Felix’s roadmap retains 4 TPD through April 2027E, while its use of both commercial-production and under-commissioning descriptions leaves future disclosures on utilisation, product output and capacity plans as the key measures to watch.

