Frog Innovations Limited Accepts ₹91.97 Crore Indus Towers LOI
Key highlights
- Frog Innovations accepted a ₹91.97 crore LOI from Indus Towers, excluding GST.
- The proposed work covers Cellular DAS supply, installation and maintenance at Delhi Metro stations and tunnels.
- Frog Innovations has targeted March 2027 for completion of supply and installation.
- The definitive purchase order or contract remains awaited after acceptance of the LOI.
powered by IRIS

Frog Innovations Limited has accepted a ₹91.97 crore, excluding GST, letter of intent from Indus Towers Limited for Cellular DAS supply, installation and maintenance across Delhi Metro stations and tunnels, with supply and installation targeted for completion by March 2027. The LOI is significant because it adds a large identified project opportunity, although the definitive order or contract is still awaited.
Know Frog Innovations inside out
Results, valuation, peers and who's buying, in one view.
What does the Indus Towers LOI cover?
The letter of intent covers the supply, installation and maintenance of Cellular Distributed Antenna System, or DAS, infrastructure at Delhi Metro stations and within tunnels. Indus Towers awarded the LOI to Frog Innovations, which has formally accepted it, according to the company's exchange disclosure dated November 6, 2026.
A Cellular DAS distributes mobile signals inside locations where normal outdoor coverage can be weak or obstructed. Metro stations and tunnels are technically demanding locations because concrete, steel and underground structures can reduce signal availability. The disclosure does not state the number of stations, tunnels, operators or network bands included in the proposed work.
The disclosed project value is ₹91.97 crore excluding GST. The filing identifies supply, installation and maintenance as the scope, while specifying that supply and installation are to be completed by March 2027. It does not disclose payment milestones, margin expectations, equipment quantities or maintenance-period terms.
Why is the ₹91.97 crore award not yet binding?
The ₹91.97 crore award remains subject to a definitive purchase order or contract because it has been communicated through an accepted letter of intent rather than a final contract. Frog Innovations stated that it had accepted the LOI, while the definitive order is awaited.
This distinction is important for investors assessing the order pipeline. An LOI records the parties' intent to proceed on the stated proposal, but the final scope and contractual obligations are generally documented through a subsequent purchase order or agreement. The company filing has therefore been classified as notable but not yet binding.
The announcement also states that no promoter or promoter-group interest is involved in the transaction. No related-party aspect was indicated in the information provided. Until the final order is issued, the disclosed LOI value should be viewed as an identified business opportunity rather than a completed revenue booking.
When is the Delhi Metro work expected to be completed?
Frog Innovations has stated that supply and installation for the Delhi Metro Cellular DAS project are to be completed by March 2027. The company has not provided a phased deployment schedule or identified interim completion dates for individual stations or tunnel sections.
The timeline places execution over the period from the November 2026 disclosure through March 2027. Installation work in operational metro environments can require coordination with site access, network requirements and project execution schedules, but the filing does not provide project-level details on these elements.
Maintenance is included in the scope described in the LOI. However, the available disclosure does not specify whether maintenance begins after commissioning, how long it would continue, or the value attributable to it. These details may be addressed in the definitive contract if it is issued.
Got a follow-up? Ask IRIS
How does this project fit Frog Innovations' business?
The project fits Frog Innovations' business of manufacturing and installing in-building coverage solutions and mobile network accessories for mobile service providers and operators. The company operates in one business segment focused on these coverage solutions.
Frog Innovations designs, manufactures and installs equipment intended to improve mobile coverage inside large structures such as airports, hospitals, high-rises and metro tunnels. Its wireless coverage portfolio includes Active DAS technology, which distributes mobile signals through a building or enclosed site across frequency bands and operators.
The company's OneDAS system is described as supporting up to eight bands and four operators. However, the LOI announcement does not identify the specific Frog Innovations products or technical configuration proposed for the Delhi Metro project. It also does not state whether any particular proprietary system will be used.
The company has additional connectivity-related service lines, including building-connectivity ratings, 5G-site implementation and indoor-coverage solutions. Its manufacturing base includes products under the Design-led production-linked incentive scheme, for which it is described as a beneficiary of more than ₹66 crore in incentives. The LOI itself does not link the Delhi Metro project to any incentive claim.
What does the LOI mean for investors and the telecom sector?
For investors, the accepted LOI provides a disclosed project value of ₹91.97 crore excluding GST, but final conversion into a binding order remains the main unresolved item. The announcement does not provide revenue-recognition timing, expected profitability, funding requirements or an estimate of the project's effect on Frog Innovations' financial performance.
The order opportunity also reflects continuing demand for indoor and enclosed-area mobile coverage infrastructure. Metro systems require connectivity across stations and underground corridors, where conventional outdoor tower coverage may not be sufficient. The LOI's focus on both stations and tunnels illustrates the role of DAS deployments in supporting mobile coverage across transit infrastructure.
Indus Towers is the identified customer, while the end-use infrastructure is the Delhi Metro network. The filing does not state which mobile operators will use the system, whether the project involves new network coverage or upgrades, or how customers will experience the service after deployment.
The immediate market relevance is therefore tied to two confirmed facts: Frog Innovations has accepted an LOI, and the stated value is ₹91.97 crore excluding GST. Investors will need to distinguish these disclosures from a definitive contract, because the final order has not yet been announced.
Conclusion
Frog Innovations has secured an important stated project opportunity through its accepted ₹91.97 crore LOI from Indus Towers for Cellular DAS work across Delhi Metro stations and tunnels. The proposed scope is aligned with the company's in-building and enclosed-area connectivity business, while the March 2027 supply and installation target provides the disclosed execution horizon.
The next item to watch is the definitive purchase order or contract, which remains awaited. Any subsequent filing could clarify the final contractual scope, project terms, execution milestones, maintenance arrangement and the timing of financial recognition.


