Hy-Tech Engineers has 483 lakh pieces capacity at 70.6%
Key highlights
- Hy-Tech Engineers has annual hydraulic-fitting capacity of 483 lakh pieces across six facilities.
- Hy-Tech Engineers reports average hydraulic-fitting capacity utilisation of 70.6%.
- Hy-Tech Engineers has captive forging capacity of 3,120 metric tonnes a year.
- Hy-Tech Engineers' Q2FY27 revenue rose 22% year on year to Rs 60.9 crore.
powered by IRIS

Hy-Tech Engineers reports 483 lakh hydraulic-fitting pieces of annual installed capacity, running at 70.6% average utilisation across six facilities, while Q2FY27 revenue increased 22% year on year to Rs 60.9 crore. Its Maharashtra and Madhya Pradesh footprint also includes 3,120 metric tonnes per annum of captive forging capacity.
Know Hy-Tech Engineers inside out
Results, valuation, peers and who's buying, in one view.
How much hydraulic-fitting capacity does Hy-Tech Engineers have?
Hy-Tech Engineers has installed capacity for 483 lakh hydraulic-fitting pieces a year across six manufacturing facilities, with average capacity utilisation reported at 70.6%. It also lists 3,120 metric tonnes a year of captive forging capacity, an upstream measure that is separate from its hydraulic-fitting piece capacity.
Hy-Tech Engineers offers more than 11,000 stock-keeping units (SKUs), including DIN metric fittings, JIC flared and flareless fittings, O-ring face seal fittings and conversion fittings. The company reports more than four decades of industry experience, 170 direct customers including original equipment manufacturers (OEMs), and an active distributor network of more than seven distributors.
The reported 70.6% rate is an average for the aggregate hydraulic-fitting capacity of 483 lakh pieces a year. The presentation does not set out capacity or utilisation by facility, product type or period, and it does not state a production target for the unused portion of installed fitting capacity.
Where are Hy-Tech Engineers' six manufacturing facilities?
Hy-Tech Engineers lists six facilities at Thane, Pithampur Unit-I, Pithampur Unit-II, Shirwal in Satara, Kavathe in Satara and Nashik. Four sites are in Maharashtra and two are in Madhya Pradesh; the footprint table identifies hydraulic fittings and identifies Nashik for forged metal parts.
The network was assembled over several decades rather than through one disclosed new greenfield fitting plant. Hy-Tech Engineers began hydraulic-fitting manufacturing at Thane in 1978, acquired a Chinchwad manufacturing unit in 1987 and a Thane unit in 1991, then acquired a carbon-steel forging unit at Nashik in 2004.
Hy-Tech Engineers subsequently added a Pithampur unit in 2008, a Shirval facility in 2010, and another Pithampur unit and the Kavathe unit in 2021. The presentation also records the 2014 acquisition of Sagar Forge Private Limited, described as the then wholly owned subsidiary, showing that the current manufacturing base combines fitting operations with forging capability.
How does Hy-Tech Engineers make hydraulic fittings?
Hy-Tech Engineers describes a vertically integrated process beginning with steel procurement and hot forging, and ending with packing and dispatch of finished fittings to business-to-business customers. Between those points, the stated production sequence includes blanking or rough machining, centreless grinding, thread rolling, computer numerical control (CNC) machining, crack testing, plating and assembly.
Hot forging is Hy-Tech Engineers' stated backward-integration point, and the 3,120-metric-tonne annual captive-forging capacity is the disclosed measure of this upstream capability. The company says its integrated manufacturing spans design, forging, machining, plating and testing, connecting raw-material processing to finished hydraulic fittings.
Hy-Tech Engineers lists ISO 14001:2015 for environmental management, IATF 16949:2016 for quality management and ISO 45001:2018 for occupational health and safety. It also lists an EIL enlistment certificate and International Railway Industry Standards (IRIS) 2025 certification; in 2025, it said certifications supporting entry into railways and defence included Defence Research and Development Organisation (DRDO) certification and Automotive Component Manufacturers Association membership.
Got a follow-up? Ask IRIS
What changed in Hy-Tech Engineers' Q2FY27 financial performance?
Hy-Tech Engineers' 70.6% average utilisation coincided with Q2FY27 revenue from operations of Rs 60.9 crore, up 22% from Rs 49.8 crore in Q2FY26. Revenue was also 41% above Rs 43 crore in Q1FY27, while H1FY27 revenue increased 18% to Rs 103.9 crore from Rs 87.8 crore in H1FY26.
Earnings before interest, tax, depreciation and amortisation (EBITDA) rose 21% to Rs 14.5 crore in Q2FY27, but the EBITDA margin declined to 23.8% from 24.0% in Q2FY26. In H1FY27, EBITDA increased 14% to Rs 22.9 crore, while the margin moved to 22.1% from 22.9% in H1FY26.
Profit after tax rose 23% to Rs 8.5 crore in Q2FY27 from Rs 6.9 crore a year earlier, and the profit margin increased to 14.0% from 13.8%. The comparison shows revenue, EBITDA and profit grew year on year, while the quarterly and half-year EBITDA margins were below their respective prior-year levels.
What balance-sheet changes accompany the existing capacity base?
Hy-Tech Engineers reported property, plant and equipment of Rs 63.9 crore at September 2026, up from Rs 59.4 crore at March 2026, while capital work in progress declined to Rs 5.3 crore from Rs 5.7 crore. These figures show a Rs 4.5 crore increase in reported property, plant and equipment during the period alongside the six-facility footprint.
Long-term borrowings were Rs 10 lakh at September 2026, compared with Rs 17.1 crore at March 2026, and short-term borrowings fell to Rs 5.5 crore from Rs 12.6 crore. Cash and bank balances on the balance sheet were Rs 39.3 crore at September 2026, while cash and cash equivalents at period-end in the cash-flow statement were Rs 1.5 crore; the presentation reports these as separate measures.
Net cash from operations was Rs 13.2 crore at September 2026, compared with Rs 30.3 crore at March 2026, while cash flow from investing activities was negative Rs 36.6 crore against negative Rs 7.2 crore. The company was listed on the National Stock Exchange and BSE on 1 September 2026 and states that it raised Rs 136 crore, but the supplied presentation does not specify an allocation of those proceeds to a new manufacturing facility.
Conclusion
Hy-Tech Engineers combines 483 lakh pieces of annual hydraulic-fitting capacity, 70.6% average utilisation and 3,120 metric tonnes a year of captive forging capacity within six facilities. Q2FY27 revenue and profit after tax rose 22% and 23%, respectively, from Q2FY26, while EBITDA margin moved down by 0.2 percentage points to 23.8%.
The key next point is whether Hy-Tech Engineers raises utilisation above the reported 70.6% rate through its existing 483 lakh-piece fitting base, or provides facility- and product-level capacity detail. Investors can also track future changes in property, plant and equipment, which increased to Rs 63.9 crore at September 2026, and the stated development of the US wholly owned subsidiary incorporated in Delaware in 2026.