NLC India Renewables Limited targets 16.2 GW portfolio by 2032
Key highlights
- NIRL's portfolio totals 16,204 MW of renewable capacity and 8,238 MWh of storage.
- NIRL has 1,784 MW operational, 5,420 MW under construction and 9,000 MW in the pipeline.
- NIRL's renewable and storage portfolio carries Rs 93,714 crore of total capital expenditure.
- Solar accounts for 12,954 MW of NIRL's portfolio and Rs 63,553 crore of capex.
powered by IRIS

NLC India Renewables Limited has outlined a 16,204 MW renewable portfolio for 2032, supported by Rs 93,714 crore of capital expenditure across solar, wind, hybrid projects and storage. NIRL had 1,784 MW operational in H1 FY27, while 5,420 MW was under construction and 9,000 MW was in the pipeline.
Know NLC India inside out
Results, valuation, peers and who's buying, in one view.
What makes up NIRL's 16.2 GW renewable portfolio?
NIRL's 16,204 MW portfolio comprises 12,954 MW of solar, 1,050 MW of wind, 600 MW of hybrid capacity and 1,600 MW of firm and dispatchable renewable energy, or FDRE. The total combines operational assets with projects under construction and in the pipeline. It is accompanied by 8,238 megawatt-hours, or MWh, of energy storage capacity across battery energy storage systems, FDRE-linked storage and pumped storage projects.
The operational base totals 1,784 MW, comprising 1,733 MW of solar and 51 MW of wind. The solar portfolio includes projects of 709 MW, 500 MW and 300 MW, as well as 130 MW of solar, 50 MW at mined-out areas, 20 MW in Andaman and 4 MW of rooftop solar. Solar therefore accounts for 1,733 MW of NIRL's operating capacity, compared with 51 MW of wind.
NIRL was incorporated on 14 June 2023 as a wholly owned subsidiary of NLC India Limited to consolidate the group's renewable business. Fifteen operational and under-construction renewable projects were transferred under a Business Transfer Agreement. NIRL's solar and wind assets are spread across Tamil Nadu, Rajasthan, Assam, Gujarat and Andaman, while its longer-term roadmap includes pumped storage, green hydrogen and electric-vehicle charging infrastructure.
How is NIRL's Rs 93,714 crore capital programme allocated?
NIRL allocates Rs 93,714 crore of total capital expenditure to the portfolio, with solar receiving Rs 63,553 crore, FDRE Rs 13,349 crore and wind Rs 7,366 crore. The presentation describes the programme as covering solar, wind and storage. These amounts include projects in operation, under construction and in the pipeline rather than only assets currently generating electricity.
Solar has 3,221 MW under construction with Rs 13,498 crore of capex and a further 8,000 MW in the pipeline with Rs 41,000 crore. Wind has 999 MW under construction with Rs 6,971 crore of capex, compared with 51 MW in operation carrying Rs 395 crore. NIRL does not show wind capacity in the pipeline, making its 1,050 MW wind total entirely operational or under construction.
Hybrid capacity totals 600 MW, all under construction, with Rs 3,173 crore allocated. Storage has separate measures because it is measured in MWh rather than generation capacity in MW. NIRL assigns Rs 2,273 crore to 2,280 MWh of battery storage and Rs 4,000 crore to 1,518 MWh of pumped storage, so these assets add storage capability without increasing the 16,204 MW generation portfolio figure.
Got a follow-up? Ask IRIS
How does NIRL's plan compare with its current operations?
NIRL's plan would take renewable capacity from 1.8 GW to 16.2 GW over the next six years, while its subsidiary presentation describes a build-out towards 16 GW by 2032. The difference between the operating base and the portfolio target is represented by 5.4 GW under implementation and 9.0 GW in the pipeline. The 16.2 GW figure is the rounded equivalent of the detailed 16,204 MW portfolio total.
In H1 FY27, renewable power reported Rs 462 crore of revenue, including inter-segment revenue, from 1,784 MW of solar and wind capacity. Thermal power reported Rs 7,571 crore from 6,620 MW, including joint ventures, and mining reported Rs 4,632 crore from 50 million tonnes per annum, or MTPA, of lignite and coal capacity. The presentation therefore shows renewable revenue below both thermal power and mining during the reported half-year period.
Renewable power represents 16% of assets in the group split, compared with 64% for thermal power and 13% for mining. Over the same six-year capacity progression, mining is planned to rise from 50 MTPA to 122 MTPA and thermal capacity from 6.6 GW to 14.9 GW. NIRL's renewable expansion is consequently presented alongside continued planned growth in mining and thermal capacity.
Why are storage and FDRE part of NIRL's expansion plan?
Storage and FDRE add 8,238 MWh to NIRL's portfolio alongside its 16,204 MW renewable generation capacity. FDRE includes 600 MW plus 1,800 MWh under construction and 1,000 MW plus 2,640 MWh in the pipeline. Together, FDRE totals 1,600 MW and 4,440 MWh, with Rs 13,349 crore of associated capex.
Battery energy storage systems account for 1,780 MWh under construction and 500 MWh in the pipeline, totalling 2,280 MWh. The presentation assigns Rs 1,715 crore to the under-construction battery systems and Rs 558 crore to the pipeline, making the combined allocation Rs 2,273 crore. No battery storage is listed as operational in the detailed portfolio table.
Pumped storage is entirely within the pipeline, with 1,518 MWh of capacity and Rs 4,000 crore of proposed capex. NIRL also identifies green hydrogen as part of its long-term technology roadmap. Elsewhere in the presentation, NLC India Limited reports that its 4 MW green-hydrogen project at Neyveli is under implementation, with the letter of award issued, contract signed and an owner's engineering consultant appointed.
Conclusion
NIRL's stated 2032 plan combines a 16,204 MW renewable portfolio with 8,238 MWh of storage and Rs 93,714 crore of capex. Solar is the largest component, at 12,954 MW and Rs 63,553 crore, but FDRE, battery storage and pumped storage account for a separate dispatchability and energy-storage element that is not captured by MW capacity alone.
The main execution measure will be progress in converting 5,420 MW under construction and 3,580 MWh of associated storage into operating assets. Management's 2032 pathway also depends on the 9,000 MW pipeline, including 8,000 MW of solar, 1,000 MW of FDRE and 1,518 MWh of pumped storage projects.