Sula Vineyards plans 30-40 room York Winery hotel by 2028
Key highlights
- Sula Vineyards plans a 30-40 room York Winery hotel in Nashik by March 2028.
- The proposed York hotel requires investment of about Rs 25 crore.
- The new property is expected to increase the current 155-key Nashik capacity by approximately 20%.
- Artisan Spirits Private Limited will develop the hotel as Sula Vineyards' fourth hospitality property.
powered by IRIS

Sula Vineyards Limited plans to develop a 30-40 room hotel at York Winery in Nashik by March 2028, investing about Rs 25 crore through internal accruals and borrowings. The proposed property, to be built by wholly owned subsidiary Artisan Spirits Private Limited, is expected to raise its current 155-key Nashik hospitality capacity by approximately 20%.
Know Sula Vineyards inside out
Results, valuation, peers and who's buying, in one view.
What is Sula Vineyards building at York Winery?
Sula Vineyards is proposing a new hospitality facility with 30 to 40 rooms at York Winery, with completion targeted for March 2028. The company disclosed that Artisan Spirits Private Limited, or ASPL, its wholly owned subsidiary, will construct and develop the hotel at the York location in Nashik Rural, Maharashtra.
The company put the required investment at about Rs 25 crore and identified a combination of internal accruals and borrowings as the financing method. The filing does not break down how much of the Rs 25 crore will come from either funding source, nor does it disclose construction milestones before the March 2028 target.
The disclosed room range is set against a current Nashik inventory of 155 keys across the company and its subsidiaries. Sula Vineyards expects the York addition to lift that capacity by approximately 20%, while the hotel would become the fourth property in its hospitality portfolio rather than an addition to its existing three-resort format.
Where will the York Winery hotel be located and operated?
Sula Vineyards will develop the hotel at Gat No. 15/2, Village Gangavarhe, Nashik Rural, Nashik, Maharashtra 422222, at the York Winery site held by ASPL. The same location is currently used by ASPL for winery operations, including wine manufacturing and production, according to the disclosure.
The filing does not specify the hotel brand, room mix, tariff, facilities or expected opening date within March 2028. It does, however, identify ASPL as both the holder of the York location and the entity that will develop and operate the proposed hospitality facility, creating a direct link between the site’s winery use and the new accommodation plan.
Sula Vineyards said the proposed York hotel will be strategically located alongside The Haven by Sula. Its existing Nashik hospitality portfolio consists of The Source at Sula, Beyond by Sula and The Haven by Sula, operated by the company and its wholly owned subsidiaries ASPL and N D Wines Private Limited.
The change is therefore from three operating Nashik resorts and 155 keys as of the disclosure date to a planned fourth hospitality property with 30 to 40 rooms by March 2028. The company frames the proximity to The Haven by Sula as part of the proposed hotel’s strategic location, but does not provide separate occupancy, revenue or profitability figures for any of the three current resorts.
Got a follow-up? Ask IRIS
How does the hotel fit Sula Vineyards' wine-tourism strategy?
Sula Vineyards said the Rs 25 crore capacity addition is part of its continued focus on strengthening and expanding its wine-tourism and hospitality business. The York property is designed to augment accommodation capacity at a location already used for wine manufacturing and production, combining a new 30-40 room hotel with the existing winery setting.
The planned addition is material to the disclosed hospitality room base because the company expects approximately 20% growth from the existing 155 keys. That comparison is the company’s stated capacity measure; it is not a forecast of revenue, occupancy, visitor numbers, average room rates or profit from the March 2028 project.
The disclosure distinguishes the hospitality expansion from Sula Vineyards’ wider standalone business, which includes the manufacture, purchase and sale of alcoholic beverages, including wines and spirits. The company also states that its revenue, costs and profits are seasonal and do not accrue evenly during the year, meaning quarterly financial results may not be strictly comparable.
The York proposal adds a fourth property alongside three Nashik resorts, rather than disclosing expansion to another city or wine region. Sula Vineyards did not disclose a separate operating segment for hospitality: its chief operating decision makers monitor the company’s operations as a whole, and the company reports no separate reportable segments under Indian Accounting Standard 108.
How will Sula Vineyards finance the Rs 25 crore project?
Sula Vineyards plans to finance the approximately Rs 25 crore York hotel through internal accruals and borrowings. The filing gives no project-specific debt amount, lending terms, interest rate, repayment schedule, equity issuance or capital-expenditure schedule for the 30-40 room development.
The standalone balance sheet as at 30 September 2026 reported current borrowings of Rs 239.82 crore, compared with Rs 214.73 crore at 31 March 2026. Non-current borrowings were Rs 38.43 crore at 30 September 2026, down from Rs 47.52 crore at 31 March 2026; these reported balances are company-wide figures and are not identified as York project financing.
Cash and cash equivalents stood at Rs 1.88 crore on 30 September 2026, versus Rs 5.57 crore on 31 March 2026, while capital work-in-progress was Rs 2.74 crore compared with Rs 0.45 crore. These balance-sheet movements provide financial context for the disclosed mix of accruals and borrowings, but the company has not said that either figure is earmarked for the York hotel.
Conclusion
Sula Vineyards has disclosed a defined hospitality expansion: about Rs 25 crore for a 30-40 room York Winery hotel, developed by ASPL and expected by March 2028. The project would take the Nashik portfolio from three resorts to four and is expected to expand the stated 155-key base by approximately 20%, supporting the company’s disclosed wine-tourism focus.
The key next disclosure to watch is progress toward the March 2028 addition, including any update on construction timing, the split between internal accruals and borrowings, and final room capacity within the stated 30-40 range. Sula Vineyards has not yet provided these details, nor has it disclosed project-specific hospitality revenue or profitability targets.


