Oswal other schemes eclipsed direct PM-KUSUM in H1 FY27
Key highlights
- Other government schemes generated Rs 502.8 crore for Oswal in H1 FY27, versus Rs 72.2 crore from direct PM-KUSUM turnkey systems.
- Oswal supplied 27,151 solar pumps in its residual category in H1 FY27, compared with 2,518 direct PM-KUSUM turnkey pumps.
- Other government-scheme revenue reached Rs 963.8 crore in FY26, up from Rs 23 crore in FY25.
- Oswal listed a 143 megawatt current order book and a 168 megawatt solar-project pipeline.
powered by IRIS

In H1 FY27, Oswal Pumps recorded Rs 502.8 crore from other government schemes, nearly seven times its Rs 72.2 crore direct PM-KUSUM turnkey-system revenue, making other schemes its largest disclosed scheme category. The category includes turnkey solar pumping systems under Maharashtra’s Magel Tyala scheme and other government programmes.
Know Oswal Pumps inside out
Results, valuation, peers and who's buying, in one view.
How did Oswal’s H1 FY27 solar-scheme revenue mix change?
Other government schemes generated Rs 502.8 crore, or 80.9% of Oswal’s Rs 621.6 crore revenue across four disclosed PM-KUSUM and government-scheme categories in H1 FY27. Direct PM-KUSUM turnkey systems contributed Rs 72.2 crore, while supplies of pumps and components without installation to PM-KUSUM participants generated Rs 46.6 crore. No H1 FY27 revenue was shown for turnkey systems supplied to participating PM-KUSUM players.
The difference between other government schemes and direct PM-KUSUM turnkey revenue was Rs 430.6 crore in H1 FY27. The revenue breakup excludes sales of traded goods and other operating revenue, while adding back discounts and incentives. It is therefore a defined operational revenue view rather than the reported revenue-from-operations measure.
Other government schemes also represented 56.9% of the Rs 883.9 crore broader revenue breakup in H1 FY27. Revenue outside PM-KUSUM and other government schemes was Rs 262.2 crore. This proportion applies to the presentation’s stated revenue-breakup categories, not to every reported revenue measure.
Why did other government schemes exceed direct PM-KUSUM revenue?
The presentation does not disclose a specific execution, pricing or installation reason for other government schemes reaching Rs 502.8 crore in H1 FY27. It identifies the category as including turnkey solar pumping systems supplied under the Magel Tyala scheme in Maharashtra and other government schemes. The available disclosure establishes the revenue-source shift but does not explain its operational cause.
Direct PM-KUSUM revenue of Rs 72.2 crore relates to turnkey solar pumping systems supplied by Oswal itself under the scheme. A turnkey system includes solar-powered submersible or monoblock agricultural pumps and motors, solar modules, mounting structures, pump controllers and installation. The comparison is therefore between direct PM-KUSUM execution and a category that includes turnkey deliveries under Magel Tyala and other programmes.
The presentation separately records Rs 46.6 crore from supplies to PM-KUSUM participants without installation services in H1 FY27. Those supplies include solar pumps, solar modules, structures and balance-of-system, or BOS, kits. Oswal does not disclose selling prices, project sizes or margins by category, so profitability and revenue per pump cannot be calculated from these figures.
Got a follow-up? Ask IRIS
How do Oswal’s pump volumes compare across solar-scheme categories?
Oswal supplied 27,151 solar pumps in its residual category, defined as supplies other than the specified direct PM-KUSUM, participant-turnkey and component-only categories, in H1 FY27. That compared with 2,518 direct PM-KUSUM turnkey pumps and 6,887 component-only solar pumps supplied to PM-KUSUM participants. The residual category includes Magel Tyala and other government-scheme turnkey systems, but is not presented as an exact revenue-category match.
Of 36,556 total solar pumps supplied in H1 FY27, the 27,151-unit residual category represented 74.3%, while direct PM-KUSUM turnkey pumps represented 6.9%. Component-only supplies represented 18.8% of solar-pump volume. Oswal showed no H1 FY27 units for turnkey systems supplied to other PM-KUSUM participating players.
The mix changed across the disclosed periods: direct PM-KUSUM turnkey volume rose to 36,046 units in FY25 from 9,383 in FY24, then fell to 18,604 in FY26. The residual category increased from 5,551 units in FY25 to 45,609 in FY26 and remained at 27,151 units in H1 FY27. These figures show that the shift visible in revenue was also accompanied by a much larger residual solar-pump volume category.
Oswal supplied 74,304 pumps in total in H1 FY27, comprising 36,556 solar pumps and 37,748 non-solar pumps. Non-solar agricultural pumps accounted for 21,484 units, while non-solar non-agricultural pumps accounted for 16,264 units. The scheme-mix change is therefore concentrated within solar pumps rather than describing the entire pump business.
How does H1 FY27 compare with Oswal’s recent revenue history?
Other government-scheme revenue had already become Oswal’s largest disclosed scheme category in FY26 at Rs 963.8 crore, ahead of Rs 534.7 crore from direct PM-KUSUM turnkey systems. This reversed FY25, when direct PM-KUSUM revenue was Rs 961.1 crore and other government-scheme revenue was Rs 23 crore. In FY24, the respective figures were Rs 327.4 crore and Rs 6.4 crore.
H1 FY27 other government-scheme revenue of Rs 502.8 crore is a half-year figure and should not be treated as a full-year comparison with FY26’s Rs 963.8 crore. Within the same H1 FY27 period, however, it exceeded direct PM-KUSUM turnkey revenue of Rs 72.2 crore. The presentation does not provide H1 FY26 revenue by these scheme categories, preventing a first-half year-on-year comparison.
Reported revenue from operations was Rs 979.9 crore in H1 FY27, down 7.0% from Rs 1,053.6 crore in H1 FY26. Operating earnings before interest, tax, depreciation and amortisation, or EBITDA, were Rs 131.7 crore, down 51.0%, while operating EBITDA margin was 13.4%, compared with 25.5% a year earlier. These reported financial figures have a different scope from the Rs 883.9 crore revenue breakup.
Oswal also describes expansion beyond solar irrigation. It entered rooftop solar in FY26 through its first order under PM Surya Ghar: Muft Bijli Yojana, while Oswal Solar Energy Private Limited holds a 60% stake in a special purpose vehicle for rooftop photovoltaic projects on Rajasthan state-government buildings under the Hybrid Annuity Mode. The presentation does not quantify H1 FY27 revenue from these rooftop activities.
Conclusion
Oswal’s H1 FY27 disclosures show that other government schemes, at Rs 502.8 crore, were the principal disclosed source of solar-scheme revenue rather than direct PM-KUSUM turnkey execution at Rs 72.2 crore. The volume data point in the same direction, with 27,151 pumps in the residual category that includes Magel Tyala and other government-scheme systems, compared with 2,518 direct PM-KUSUM turnkey pumps.
The next disclosures to watch are execution against Oswal’s 143 megawatt current order book, 168 megawatt pipeline and 200 megawatt tender participation. Management’s rooftop expansion plan, including the Rajasthan project vehicle with a 60% Oswal Solar stake, may also show whether non-irrigation solar revenue becomes separately measurable.


