PPA Execution
ACME subsidiary signs 25-year PPA with SECI for 190 MW hybrid project
ACME Urja One Pvt Ltd (ACME Solar subsidiary) executed a 25-year PPA with SECI for a 190 MW ISTS-connected wind-solar hybrid project with BESS at Rs.4.72/unit, SCOD 27-Feb-2028 and assured peak power supply.




